The building manager of my apartment was recently fired after a viral video surfaced of him allegedly physically pushing a tenant out of his office. I found it interesting in the same way one does when watching any other train wreck in slow motion. Afterwards, an article was posted on The Record (Waterloo’s local paper) where an IN8 spokesperson, Darryl Firsten, stated:
“This is our 11th building in Waterloo and 10 out of 10 have been done on time, right down to the last blade of grass,” Firsten said.
I live in Sage 3 Waterloo, which is an IN8 development. I can confirm that, when I moved in on May 1st, 2015, it was so unfinished that we didn’t even have blades of grass. Work was being done for weeks after we moved in, including things like laying down sod, putting up fencing, putting furniture in the lobby, insulating pipes in the underground garage, adding locks to the outside doors, actually having a door in some places (rather than just a portal).
We were very lucky that the units themselves were ready. Many tenants of Sage 2 are not so lucky.